Winnebago County, Ils.
Signs are placed in advance to the warning drivers of the upcoming work zone.
The traffic on the I-90 in the east is reduced to two lanes and moved to the left shoulder. According to the Illinois Department of Transportation, the change will be available from Monday, September 29th to the end of the week.
The maintenance and repair work include paving, structure and bridge connection repairs.
Cards and design information can be found in the Projects section on the Tollway website.
Copyright 2025 Wifr. All rights reserved.